Tech; Pg 2 Ramairbox Install (with KnN FIPK) Go to Pg 1 of install
Pull the rubber filler off the tabs at the bottom on both sides of the rad Passenger side The tab holding the filler on the rad at bottom had to be cut off to pass the duct threw
Large clamps wrapped around filler and duct held things well A bit of patience to get it threw this far but it holds tight at well over 100mph Planned to paint them but still haven't got a round to it
Return to TECH or click below |
Copyright © 1999-2009 RM Indy's RAMPAGE |